BARBICAN RENEWAL PROGRAMME – DEMOLITION AND STRUCTURES
The Mayor and Commonalty and Citizens of the City of London
Demolition and Structures – Barbican Renewal Programme. Refurbishment and alteration to an existing, occupied Grade II listed Brutalist concrete building (1965-1982) – not new-build; minimal structural intervention philosophy, using existing capacity and justifying retained elements without replacement.
Reference
089135-2026
Total value (estimated)
- £19,200,000 including VAT
Main procurement category
Works
Contract locations
- UKI – London
Contracting authority
The Mayor and Commonalty and Citizens of the City of London
United Kingdom
